Check the structural integrity Evidence of water damage, dry rot, or mould damage may be apparent. Carefully examine the plumbing lines for leaks. We fix the areas that need to be repaired, correct any drainage and plumbing problems and then replace the wall linings before continuing.
Rough-in Plumbing fixtures related to Water & Gas
Rough-in Electrical fixtures
Carpentry – Wall Frames, Floor Frames, Noggin etc
Insulation – Wall & Ceiling as per the site requirement
Plastering – Sheeting & Rendering
Step 6 – Waterproofing
As a step to preventing any further damage, we place an emphasis on waterproofing, ensuring that all wet areas are adequately sealed before commencing the tiling.
Step 7 – Tiling
Floor Tiling
Wall Tiling
Grout, Silicon & Trims
Insulation – Wall & Ceiling as per the site requirement
Plastering – Sheeting & Rendering
Step 8 – Fit off
Plumber, Electrician, Painting
Step 9 – Final Completion & Accessories Installation
Vanity & Basin
Shower Screens
Bath
Towel Rails, Toilet roll holder and other accessories