Step 1 – Concept & Quotation

  • Meeting with a consultant
  • The design process
  • Material Selection

Step 2 – Check Measure

  • Tiling Layouts
  • Estimated preferred start and finish dates
  • Contracts
james11
bathroom_2

Step 3 – Planning & Scheduling Trades

  • Setting up K360
  • All trades will be booked

Step 4 – Strip out - Demolition & Removal

  • The existing bathroom fittings
  • tiles and anything else not staying

Step 5 – Preparation &Rough in

  • Check the structural integrity
    Evidence of water damage, dry rot, or mold damage may be apparent. Carefully examine the plumbing lines for leaks. We fix the areas that need to be repaired, correct any drainage and plumbing problems and then replace the wall linings before continuing.
  • Rough – in Plumbing fixtures related to Water & Gas
  • Rough – in Electrical fixtures
  • Carpentry – Wall Frames, Floor Frames, Noggin etc
  • Insulation – Wall & Ceiling as per the site requirement
  • Plastering – Sheeting & Rendering
james7
james9

Step 6 – Waterproofing

  • As a step to preventing any further damage, we place an emphasis on waterproofing, ensuring that all wet areas are adequately sealed before commencing the tiling.

Step 7 – Tiling

  • Floor Tiling
  • Wall Tiling
  • Grout, silicon& Trims
  • Insulation – Wall & Ceiling as per the site requirement
  • Plastering – Sheeting & Rendering

Step 8 – Fit off

  • Plumber, Electrician, Painting

Step 9 – Final Completion & Accessories Installation

  • Vanity & Basin
  • Shower Screens
  • Bath
  • Towel Rails, Toilet roll holder and other accessories
  • Shower Base

Step 10 – Completion and handover

  • Final Inspection
  • Celebrating your new bathroom